The South Pars field is located in the Persian Gulf approximately 100 km south-west ‎of Assaluyeh, and 175km West of Kish Island ‎ Pars Oil and Gas Company (POGC) as client is developing Phase 15 of the field ‎which will allow a gas production of 1000 MMSCFD. Produced gas is routed via 32 ‎inch pipeline to onshore facilities in Assaluyeh. Gas export line is accompanied with a ‎‎4 inch MEG line.‎ The EPC Contract of Offshore facilities of this phase have been awarded to SAFF as ‎Contractor. Basic/Feed has been performed by Aker Kvaerner & detail design is to be ‎done by SLTE. SAFF has invited SAFF-ROSEMOND Engineering & Management ‎Company for Project Management Consultancy (PMC) of detail engineering services. ‎SAFF-ROSEMOND performs PMC of the Detail Design Engineering of Phase 15 ‎offshore facilities. This offshore facilities are includes: ‎ ‎

  • One well head platform
  • One intermediate support platform
  • Two bridges
  • One remote flare platform
  • Client:
  • Sub-Contractor:
  • Date of Award:
  • Fabrication Location:
  • IOEC/ SAFF
  • Saff Rosemond
  • 2010
  • Persian Gulf

  • Installation
  • Engineering including
  • Load out
  • Transportation
  • Sea fastening
  • Launching
  • Floating
  • Upending
  • Pile Installation
  • nstallation of Boat landing and wellhead module