The South Pars field is located in the Persian Gulf approximately 100 km south-west of Assaluyeh, and 175km West of Kish Island Pars Oil and Gas Company (POGC) as client is developing Phase 15 of the field which will allow a gas production of 1000 MMSCFD. Produced gas is routed via 32 inch pipeline to onshore facilities in Assaluyeh. Gas export line is accompanied with a 4 inch MEG line. The EPC Contract of Offshore facilities of this phase have been awarded to SAFF as Contractor. Basic/Feed has been performed by Aker Kvaerner & detail design is to be done by SLTE. SAFF has invited SAFF-ROSEMOND Engineering & Management Company for Project Management Consultancy (PMC) of detail engineering services. SAFF-ROSEMOND performs PMC of the Detail Design Engineering of Phase 15 offshore facilities. This offshore facilities are includes:
- One well head platform
- One intermediate support platform
- Two bridges
- One remote flare platform
- Client:
- Sub-Contractor:
- Date of Award:
- Fabrication Location:
- IOEC/ SAFF
- Saff Rosemond
- 2010
- Persian Gulf
- Installation
- Engineering including
- Load out
- Transportation
- Sea fastening
- Launching
- Floating
- Upending
- Pile Installation
- nstallation of Boat landing and wellhead module